Madison St. Water Main Replacement

Challenge The Wrentham Water Department required the replacement of two existing 12-inch dead end watermains with a new 16-inch loop through Madison Street.  The purpose of this project was to increase fire flows and provide redundancy throughout the water distribution system.  Despite the critical nature of this watermain loop, the project had never been attempted … Read more

City of Springfield Lake & Pond Management Plan

Challenge The City of Springfield is responsible for 22 waterbodies within its borders. These desirable natural resources in an urban setting provide a valuable public recreational resource but are adversely affected by the encroaching urban development. GZA has been engaged by the City to stay abreast of related wetlands regulatory compliance and to address ongoing … Read more

Route 1 Reinforcing Water Main

Challenge When the Wrentham water distribution system required improvements to provide fire flow to an area targeted for economic development, GZA was asked to design the installation of 5,500 feet of 12-inch reinforcing main. Timing was critical to support a planned development project and to meet the requirements of the State MassWorks Grant, which funded … Read more

Water Tank Rehabilitation & Appurtenant Work

Challenge The six-million-gallon capacity Oak Hill tank is critical to meeting peak demands and fire flows in the Attleboro water system. When its original coating systems failed, resulting in corrosion and metal loss, and thermal stratification in the tank threatened water quality, GZA provided concept to start-up engineering services to address these issues and maintain … Read more

Luther’s Reservoir Dam & Pumping Station Rehabilitation

Challenge The Luther’s Reservoir Dam and Pumping Station are critical to the water supply system for the City of Attleboro. When the dam was deemed to be in poor condition and the pumping station found to be in need of modernization, GZA was retained to provide comprehensive dam safety and water supply engineering services to … Read more

City of Northampton Climate Resiliency and Regeneration Plan

Challenge GZA was selected to advance the City of Northampton’s Climate Resiliency and Regeneration Plan by providing conceptual to final construction-ready design of green infrastructure solutions to improve flood control and stormwater management during extreme weather events. Solution GZA is collaborating with the City of Northampton’s Office of Planning & Sustainability and Department of Public … Read more