Former MGP Site In-Situ Stabilization/Solidification (ISS)

Challenge GZA performed turnkey remediation of a former manufactured gas plant (MGP) site where soil impacted by coal tar had contaminated groundwater. Regulatory compliance, environmental impact during construction, and cost effectiveness were key client considerations. Solution After GZA’s site investigation, contaminant delineation, and remedial alternative evaluation, the selected remedy was in-situ stabilization/solidification (ISS) of contaminated … Read more

Confidential Utility MGP Program Management

GZA is managing the investigation and/or remediation of four former manufactured gas plant (MGP) sites in the Mid-Atlantic region. Challenge The hydrogeologic conditions are complex and vary dramatically at each site. Active use of several sites and third-party ownership requires additional planning and collaboration. The on-site presence of NAPL, potentially impacting an adjacent water body, … Read more

Confidential Client- In-Situ Stabilization/Solidification (ISS) of Former MGP Site

Challenge A confidential client selected GZA to perform turnkey remediation of a former manufactured gas plant (MGP) where soil impacted by coal tar had contaminated groundwater at the site. The site’s location in a densely populated area necessitated additional monitoring. Compliance with the Massachusetts Contingency Plan (MCP), cost-effectiveness of the remedy implementation, and environmental impact … Read more

Deep Soil Mix Cut-off Wall, Former MGP Site

GZA delineated MGP constituents at this former MGP site, identifying contaminants in soil between layers of silt that extended very deep into the groundwater in the Site’s residential neighborhood. Challenge To isolate this residual product and prevent it from acting as a continued source to impact groundwater, GZA designed and installed a groundwater cutoff wall … Read more

Former Supertane MGP – VCP to Greenspace

Following closure of this former manufactured gas plant (MGP) which had operated between 1881-1953, residual coal tar byproducts were identified within the Site’s soils and shallow groundwater. As a sub consultant to the firm that had delineated the contamination, GZA developed a remedial approach that was funded by an EPA Revolving Loan Fund and the … Read more

Former MGP Site: Cutoff Wall & Jet Grouted Bottom – Wetlands Design

Challenge Three independent remediation contractors had already been retained by the Owner on this complex former MGP site when GZA was contracted as Construction Manager as Agent. The contractors’ scopes of work included demolishing buildings; relocating an active rail line; re-routing subsurface utilities; relocating a non-interruptible high-voltage power distribution lines to a local hospital; reclaiming … Read more

MGP Remedial Design & Construction- Resort Community

This former MGP Site is located in a historic, seasonal resort community adjacent to a tidally-influenced wetlands. The utility company was under a consent order to complete the remediation. Challenge To protect the vibrant tourism economy of this residential/commercial ocean-side community, remedial construction was allowed only in the off-season. Obtaining access agreements with multiple residents, … Read more

Former MGP Site, In-Situ Stabilization/Solidification (ISS)

Challenge GZA’s remedial design at this former manufactured gas plant (MGP) needed to address coal-tar-impacted soils to depths of up to 35 feet below ground surface (bgs).   Solution GZA first evaluated a remedial action involving excavation and disposal of tar-impacted soil to depths of up to 35 feet bgs and below groundwater in soils … Read more

Former MGP Site, In-situ Solidification & Stabilization

Challenge GZA investigated and undertook complex soil and groundwater remediation at this site, impacted by historic manufactured gas plant (MGP) activities, which houses the town’s century-old, 165-foot water tower. The high-profile project, located in a residential/commercial area, also addressed multiple stakeholder concerns. Solution GZA delineated impacted soil and groundwater and prepared a remedial alternative feasibility study … Read more

Remedial Investigation/Remedial Action, Former MGP Site on Tidal River

Challenge GZA was selected to complete the delineation and present remedial alternatives to achieve closure at a site impacted by a former Manufactured Gas Plant (MGP). The site, in a densely populated area adjacent to a tidal river, required strong environmental and geotechnical engineering, as well as regulatory expertise. Solution After delineating the extent of … Read more

Former Manufactured Gas Plant (MGP), Site Remediation

Challenge In 2010, when coal tar was detected in the harbor adjacent to a former manufactured gas plant (MGP) site, GZA was retained to analyze the preliminary site investigation data previously collected. The redeveloped site now spans upland and in-water properties owned and operated by several different entities. GZA’s services expanded as client’s needs grew … Read more