Ituango Hydroelectric Dam Geotechnical Instrumentation Audit
Construction of the 2,400-megawatt Ituango Hydroelectric Dam began in 2010 to significantly expand Colombia’s electrical generation capacity. A diversion tunnel collapse in 2018, during construction, required flooding of the unfinished powerhouse and accelerated dam construction to ensure the safety of the downstream population. As a result of the collapse and subsequent re-insurance requirements, the dam … Read more