Algonquin Power Air Turbine Permitting
Challenge GZA was contracted by a long-time client, Algonquin Power Windsor Locks (APWL) to secure expedited permitting for the proposed 15-MW combustion turbine at its existing cogeneration facility in Connecticut. The project received a capital grant of $6.5 million from the Connecticut Department of Public Utility Control (DPUC) contingent upon the turbine being operational within … Read more